Gas Treatment Plant, 1А Achimovsky deposit, Urengoyskoe field

A complicated problem relating to provision of required conditions both for gas and condensate has been successfully solved. This problem was solved without equipment number and metal consumption increase.

Customer: LLC Achimgaz
Field facility: 1A Achimovsky deposit, Urengoyskoe field, RF, YNAA, Urengoy
Equipment: two gas and condensate treatment shops, process equipment package
Scope of work: Design, manufacturing, supply and installation supervision
Production capacity: 2 process trains, each of 2 bln.m3/year

Reference

Limited Liability Company “CKBN Engineering” is the General Supplier of main process equipment for the development of Site 1A of Urengoy Gas & Condensate Field Achim Deposits for the period of pilot operation…