Gas-measuring station of Nakhodkinskoye field GCS 12 Yamburgskaya gas pipeline connection point

Gas Treatment Plant, Nakhodkinskoe gas field. Gas-measuring station of Nakhodkinskaya GCS 12 Yamburgskaya pipeline connection point to Tyumentransgas gas pipeline system

Customer: LLC LukOil- WestSiberia
Field facility: Gas metering station of Nahkodka field GCS 1-2 Yamburgskaya pipeline connection point to Tyumentransgas gas pipeline system,
Equipment: Automated LTS equipment package, PCS, capacitive equipment, software and hardware complex, gas-measuring station automatic control system
Production capacity: 10 bln м3/year
Scope of work: engineering design, manufacturing, delivery, installation supervision, start up and commissioning, personnel training, pilot operation.

Reference

Limited Liability Company “CKBN Engineering” acts as the GENERAL SUPPLIER for the complex delivery of packaged equipment for the Gas Complex Treatment Facility of Nakhodkinskoye Gas Field (production capacity – 10.0 billion m3/year)…