All projects

  • Customer: LLC LukOil- WestSiberia
    Field facility: Gas metering station of Nahkodka field GCS 1-2 Yamburgskaya pipeline connection point to Tyumentransgas gas pipeline system,
    Equipment: Automated LTS equipment package, PCS, capacitive equipment, software and hardware complex, gas-measuring station automatic control system
    Production capacity: 10 bln м3/year
    Scope of work: engineering design, manufacturing, delivery, installation supervision, start up and commissioning, personnel training, pilot operation.

  • Customer: OJSC NK ROSNEFT
    Field facility: Second train condensate stabilization plant, Tarasovskoe field, RF, YNAA, Gubkinsky
    Equipment: Automated process equipment package, PCS, capacitive equipment, utilities
    Production capacity: 1 mln. tones per year
    Scope of work: EPCC

  • Customer: OJSC SURGUTNEFTEGAZ
    Field facility: Gas dehydrator and TEG regenerator, Fedorovskoye field, RF, YNAA, Surgut, Fyodovsk Region
    Equipment: Process equipment package, including utilities
    Production capacity: 2,2 bln m3/year
    Scope of work: engineering design, manufacturing, delivery, contract supervision, start up and commissioning

  • Customer: OJSC NK ROSNEFT
    Field facility: Central gathering station (CGS), Vankorskoye field
    Equipment: Feed gas dehydration unit, gas dehydrator, condensate production unit, fuel gas unit
    Production capacity: 6,22 bln. m3/year (for gas), 571,2 thousand tons a year (for condensate)
    Scope of work: field facility and equipment design, manufacturing, supply, installation supervision, start-up and commissioning

  • Customer: LLC LukOil- WestSiberia
    Field facility: Lokosovsky gas processing plant
    Equipment: Revamping, 2-d stage
    Scope of work design and supply of 2 (two) heaters on a turn-key basis, including PCS

  • Customer: OJSC NK ROSNEFT
    Field facility: Gas glycol dehydrator for Troitsky GTP, RF, Krasnodar Territory, Slavayansk na Kubani
    Equipment: Gas glycol dehydrator
    Production capacity: 1,5 bln m3/year
    Scope of work: EPCC

  • Customer: LLC ACHIMGAZ
    Field facility: 1A Achimovsky deposit, Urengoyskoe field, RF, YNAA, Urengoy
    Equipment: Two gas and condensate complex treatment shops, process equipment package
    Production capacity: 2 process trains, each of 2 bln m3/year
    Scope of work: Design, manufacturing, delivery, installation supervision

  • Customer: OJSC SURGUTNEFTEGAZ
    Field facility: TEG regenerator delivery for Gas Dehydrator, Compressor Station-1, Lyantorskoe field
    Equipment: Process equipment package, including utilities
    Production capacity: 126 thousand m3/year
    Scope of work: Engineering design, manufacturing, delivery, installation supervision, start up and commissioning

  • Customer: LLC GEOGAZ (FSUE (Federal State Unitary Enterprise) Nizhnevolzhskgeologiya”
    fField facility: Perelyubskoe condensate field
    Equipment: LTS automated process equipment package, PCS, vessels
    Production capacity: 175 mln m3/year
    Scope of work: EPCC

  • Customer: OJSC ARCTICGAZ
    Field facility: Evo-Yakha oil, gas & condensate field
    Equipment: LTS automated process equipment
    Scope of work: Design, manufacturing, delivery